SKU: LSHAPE-LH15

Linea 1500mm L-Shape Shower Bath, Front Panel & Screen - Left Hand (15532) Acrylic


Click for price What's this?

Sign In For Price

  • Clock Icon In Stock For Immediate Dispatch
Product Details
  • Left Hand
  • Space Saving
  • Modern Shower Bath
  • Includes Hinging Shower Screen
  • Includes Bath Panel
  • High Grade Acrylic

Linea 1500mm L-Shape Shower Bath, Front Panel & Screen - Left Hand 

Sturdy acrylic construction that's smooth and warm to the touch along with a versatile modern look make this a highly practical shower bath that reflects a modern taste.

Why Choose a Shower Bath?

A savvy and increasingly popular choice for modern style bathroom suites, shower baths combine all the benefits of shower enclosures and baths into one attractive, space saving unit.

Signature Features

  • Space Saving
  • High Grade Acrylic
  • Includes Hinging Bath Screen
  • Includes Bath Panel
  • Taps & Waste Sold Separately
  • Supplied Undrilled for Tapholes
  • End Panel Not Included - Sold Separately

Peace of Mind?

This stylish bath comes with a 5 Year Manufacturer's Guarantee meaning you can enjoy your luxury bath for longer!

More Information
Manufacturer Objekt Ceramica
Bath Height 400mm
Bath Width 855mm
Bath Length 1500mm
Bath Shape L-Shape
Bath Style Modern
Bath Type Shower Bath
Bath Tap Mount Undrilled for Taps
Material Acrylic
Waste Supplied No
Technical Sheet download Download

Service

Small Deliveries

Medium Deliveries

Large Deliveries

Mainland UK - Standard Delivery

2-3 days from dispatched

£6.99

£10.99

£49.99

Northern Ireland - Standard Delivery

Next working day from shipping

£6.99

£10.99

£29.99

Please note products we do not hold in stock will take longer to be delivered. Please contact us for more accurate delivery times if you need your order urgently.


Copyright © 2013-present Magento, Inc. All rights reserved.